iform – Toolmaking by igus

Precise tools are the prerequisite for high-quality components. We at igus manufacture the tools for our injection moulding in our own in-house iform tool shop. From tool development, production and sampling up to quality control with computer tomographic support, a tool is made completely by our hands. This gives us the opportunity to implement requests for individual components at short notice and in full quality. Since the tool shop is involved in the development and consultations with customers at an early stage, we can offer not only suitable materials but also the appropriate tool manufacturing processes to reduce overall costs. Depending on the order volume, a mould can also be produced as print2mold in 3D printing, naturally also at our premises and from our proven high-performance polymers.

Main tasks

  • Development, production and sampling of tool technology for all igus injection moulding products
  • Enabling the fastest possible tool repairs and maintenance to ensure delivery capability for our customers
  • Design of technical innovations together with sales, development and production
Icon staff

100

Staff
Icon factory

1,550 m2

Area
Icon tooling machinery

32

Machine tools
Icon toolmaking

Over 3,000

Tool extensions
Icon injection moulding tool

Over 1,000

Injection moulded parts per year

Excellent toolmaking

RWTH Aachen and Fraunhofer Institute choose Toolmaker 2022

Watch now: iform's application video for the competition
Every year, the "Excellence in Production" competition is organised by the Machine Tool Laboratory WZL of RWTH Aachen University and the Fraunhofer Institute for Production Technology IPT. The motto: Learn from the best! We are delighted that our toolmaker iform has won this year in the category "Internal toolmaker with more than 50 employees". One of the decisive factors for the jury was the focus on short throughput times and process standardisation. The FastLine, in which we guarantee the supply of tools for individual customer special parts for volume production within seven days, particularly convinced the jury. See for yourself the advantages of our excellent toolmaking.  
You can see what makes our toolmaking special in the video on the left. 

New manufacturing line for new service

igus FastLine - injection-moulded special plain bearings in seven days

With the FastLine service, you have the possibility to receive injection-moulded plain bearings and thrust washers in a maximum of seven days. You can easily find out whether injection moulding or a different manufacturing method is worthwhile for you in the iglidur plain bearings designer: the online tool offers a price comparison of all igus manufacturing methods and a comparison with our standard product range. That way, you can always keep an eye on the best price.
FastLine service


Step by step to the finished tool


CAD tool model

Tool simulation and development

The combination of detailed simulation of the parts and decades of design experience of our employees enables tailor-made tool concepts. On the basis of early co-ordination between part and tool design, the production effort can be optimised, saving time and costs.
Digital project planning

Project planning

Our digital project planning forms the basis for high resource efficiency. The virtual representation of all production processes in real time makes it possible to plan the project process taking into account all available machine and employee capacities. In this way, it is possible to achieve optimum machine utilization and to reduce throughput times to a minimum.
Tool production milling machine
Tool production automation
Tool assembly

Tool production

Our machinery, comprising 27 systems, is equipped with state-of-the-art processing machines and a wide range of production technologies. Thanks to the networking of machines and the use of automation, we are able to produce the most demanding components in the shortest possible time while complying with the tightest tolerances.
Technical centre

Sampling in the technical centre

The process stability of the tools is validated in iform's own technical centre. Injection moulding machines with up to 100t clamping force are available for commissioning and optimisation of the injection process. The top priority when sampling the tools is always to achieve the optimum in terms of economy and component quality.
Comparison of simulation - CT

Quality assurance

By using tactile 3D measurement and advanced computer tomography (CT) we ensure the best possible quality and function of our products. The extensive possibilities of part-to-CAD comparison, inclusion analysis and assembly inspection support us in correcting the tools as required.

igus components arranged in a horizontal eight

High-volume production of individual injection-moulded parts

From the drawing with the right manufacturing process to the high-volume production of your plastic component. 


Consulting

I look forward to answering your questions

Shipping and consultation

In person:

Monday to Friday from 7 am - 8 pm.
Saturdays from 8 am- 12 pm.

Online:

24h


The terms "Apiro", "AutoChain", "CFRIP", "chainflex", "chainge", "chains for cranes", "ConProtect", "cradle-chain", "CTD", "drygear", "drylin", "dryspin", "dry-tech", "dryway", "easy chain", "e-chain", "e-chain systems", "e-ketten", "e-kettensysteme", "e-loop", "energy chain", "energy chain systems", "enjoyneering", "e-skin", "e-spool", "fixflex", "flizz", "i.Cee", "ibow", "igear", "iglidur", "igubal", "igumid", "igus", "igus improves what moves", "igus:bike", "igusGO", "igutex", "iguverse", "iguversum", "kineKIT", "kopla", "manus", "motion plastics", "motion polymers", "motionary", "plastics for longer life", "print2mold", "Rawbot", "RBTX", "RCYL", "readycable", "readychain", "ReBeL", "ReCyycle", "reguse", "robolink", "Rohbot", "savfe", "speedigus", "superwise", "take the dryway", "tribofilament", "tribotape", "triflex", "twisterchain", "when it moves, igus improves", "xirodur", "xiros" and "yes" are legally protected trademarks of the igus® SE & Co. KG / Cologne in the Federal Republic of Germany and where applicable in some foreign countries. This is a non-exhaustive list of trademarks (e.g. pending trademark applications or registered trademarks) of igus GmbH or affiliated companies of igus in Germany, the European Union, the USA and/or other countries or jurisdictions.

igus® SE & Co. KG points out that it does not sell any products of the companies Allen Bradley, B&R, Baumüller, Beckhoff, Lahr, Control Techniques, Danaher Motion, ELAU, FAGOR, FANUC, Festo, Heidenhain, Jetter, Lenze, LinMot, LTi DRiVES, Mitsubishi, NUM,Parker, Bosch Rexroth, SEW, Siemens, Stöber and all other drive manufacturers mention on this website. The products offered by igus® are those of igus® SE & Co. KG